A smart site project in Suzhou

Posted in 新闻消息  |  Tagged , , , Leave a comment

Brief description of the project

Project requirements: locate the personnel location information in the construction area, real-time statistics on the number and distribution of personnel. Access control personnel attendance.

Project Scope: Outdoor construction site, covering more than 20,000 m2 .

Number of wireless base stations: approx. 16 Number of network base stations: approx. 2

Location server: 1 Approx. 300 targeted personnel

Networking: wired & wireless                                                           

Project cycle: 2 months

Product Configuration Information

location server

location tag

Can provide a variety of needs of the location of the tab, in addition to the location of the function, sound, light flashing, SMS release of the special tab page is convenient to apply in such scenes

Contacts
Editor-in-chief of the website.

Content review.

Leave a Reply

en_USEnglish